New Kitchen

14B02_0010_sz01

Before the remodel

14B02_0001_sz01

Before the remodel

14B05_0002_sz01

The initial demolition

14B05_0019_sz01

A room full of cabinets and appliances

14B05_0020_sz01

My contractors

14B08_0009_cr01_sz01

My makeshift cook ‘n’ clean station.

14B08_0003_sz01

No more window! I think the neighbors will notice.

14B11_0001_sz01

Plumbing, electrical, framing, insulation…done.

14B11_0015_sz01

The drywall is installed.

14B15_0012_sz01

Taping and texturing is complete. There must be a lot of VOCs in that stuff, because it hurt my eyes until it dried.

14B19_0005_sz01

Floor underlayment installed

14B19_0015_sz01

The base cabinets are all in!

14B19_0010_sz01

Testing the sink setup

14B21_0016_sz01

Wall cabinets and more lighting!

14B21_0020_sz01

…and one of the windows is in.

14C02_0008_sz01

Here’s the new flooring!

14C02_0024_sz01

And the countertops…

14C02_0028_sz01

…with the sink installed.

14C12_0018_sz01

Range hood and one pendant light.

14C12_0020_sz01

The other pendant light, and, um…

14C12_0029_sz01

…cabinet pulls (handles)!

14C12_0028_sz01

I got as much into the shot as I could. I’ve since moved all my stuff back, and I really love the way the kitchen works, but the window has been delayed.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: